新华二小位于衢州市,地处教育资源较为集中的城市文教区,总建筑面积约37,182㎡。设计采用动静分区的规划模式,分为运动区和教学区两部分。其中教学区采用 “大尺度围合 + 小尺度组合”的规划策略,“U 形”教学区的建筑布局 , 让学生在“围合”的空间得到安全感,内部形成大面积庭院,并将小尺度体量置入大庭院中,形成街巷空间立体活动空间。
Xinhua No.2 Primary School is located in Quzhou City, which is located in the urban culture and education district, with a total construction area of 37,182 square meters. The design adopts dynamic and static zoning planning mode, which is divided into two parts: sports area and teaching area. The teaching area adopts the planning strategy of "large scale enclosure + small scale combination". The architectural layout of the "U-shaped" teaching area gives students a sense of security in the "enclosed" space, forming a large area compound courtyard inside, and placing the small scale volume into the large courtyard to form the three-dimensional activity space of streets and lanes.
项目名称: 衢州新华第二学校
项目地点:中国衢州丨项目面积:37,182 ㎡
项目周期:2021(设计)2022(完工)
Project Name: Quzhou Xinhua No.2 Primary School
Location: Quzhou, China 丨Project Area: 37,182 ㎡
Project Dates: 2021 (design) 2022 (completed)
Cooperative Design Institute: TINSHINE Group
Construction Contractor: XINHUA Construction Group
Client: Quzhou West Investment Co. LTD
Area: 37,182 m2
Year: 2021
Photographs: Wu Qing Shan
来自 (SEE MORE) LYCS Architecture
|